Skip to main content
 For those interested in the UK "permitted Development" rules for Outbuildings, that often do not require planning permission, see below for details from the Gov. site.

http://www.planningportal.gov.uk/permission/commonprojects/outbuildings

Outbuildings are considered to be permitted development, not needing planning permission, subject to the following limits and conditions:
  • No outbuilding on land forward of a wall forming the principal elevation.
  • Outbuildings and garages to be single storey with maximum eaves height of 2.5 metres and maximum overall height of four metres with a dual pitched roof or three metres for any other roof.
  • Maximum height of 2.5 metres in the case of a building, enclosure or container  within two metres of a boundary of the curtilage of the dwellinghouse.
  • No verandas, balconies or raised platforms.
  • No more than half the area of land around the "original house"* would be covered by additions or other buildings.
  • In National Parks, the Broads, Areas of Outstanding Natural Beauty and World Heritage Sites the maximum area to be covered by buildings, enclosures, containers and pools more than 20 metres from house to be limited to 10 square metres.
  • On designated land* buildings, enclosures, containers and pools at the side of properties will require planning permission.
  • Within the curtilage of listed buildings any outbuilding will require planning permission.

Outbuildings mini guide

Check out our interactive mini guide to outbuildings.
Access our interactive guide to the planning permission and permitted development regimes for outbuildings.
*The term "original house" means the house as it was first built or as it stood on 1 July 1948 (if it was built before that date). Although you may not have built an extension to the house, a previous owner may have done so.

Comments

Popular posts from this blog

Paul Ridley, Founder of the Cabinz Project has invented "Shelter Banks" Where People Can Collect Materials to Build Basic Shelters

Press Release:

"Shelter Banks" Similar to Food Banks.Providing Building Materials For Outbuildings, to People Squeezed Into The Smallest Houses in Europe


The Uk Property market has been in crisis for many years. The new concept of Shelter Banks, aims to help ease a part of that crisis.

They are similar to Food Banks in the Uk, but distributing, re-used & re-manufactured building materials that have been donated or bought in bulk at low cost.
The shelters built with these materials, may be storage sheds, greenhouse or insulated garden offices for small businesses.

To facilitate this, building materials are stored in a warehouse and collected by local people, or posted to target low income groups, individuals or small businesses over a wider area.

Some materials will be free, but it depends on the amount of resources, funding & donations available, as to whether materials will have to have a small charge. If so, due to low overheads & donator support, they will much chea…

Treated 6mm Birch Plywood Shingle Off Cut Cladding Shelter Experiment

Treated 6mm Birch Plywood Shingle was screwed to 2m Plastic Door edge strip (DES) horizontal battons. 42mm & 75mm drywall screws were used (no extra glue)

The off cuts were donated from a local fencing co. that also make rabbit hutches, from which these off cuts arose

Off cuts were dipped in decking / fencing preserver, so a few 'tide marks' are present.
This was done to get more preserver deeper into the wood .

We wait to see how it weathers & it will hopefully make our first prototype shelter more attractive (still going strong after 2.3 yrs)

More off cut cladding picture variations to come 

Some off cuts have been donated to Woodcraft to Wellness Chester













Close up







Hurricane Damaged Shelter Recovery Method for British Virgin /Caribbean Islands / Usa with little or no budget

Hurricane Damaged Shelter Recovery Proposal Method for British Virgin /Caribbean Islands / Usa with little or no budget
Hurricanes Harvey and Irma Damage, America Can’t Afford to Rebuild 
Method 
1. Collect wood that is plentiful due to fallen trees / joists / stick frames 
2. Sort or cut wood into 50mm /70 / 140mm thick planks
3. paints planks with preservative 
4. Clad & nail / screw planks inside galvanised drywall lining channel or purlins, salvaged from destroyed buildings 
5.Drill holes in structurally sound brick walls, insert plastic walls plugs , glued in with injection resin or adhesives
6. Screw metal clad  planks to wall, horizontally & vertically , so a 2.4 x1.2m sheet can be screwed to it    
7  Fill insulation voids with plastic bottles filled with polystyrene or bubble wrap (or sand / soil / water if thermal mass / heavier wall weight required) .